Poudre School District Transportation Facility

<< Go Back

Fort Collins, CO
Property Type: Operable Partition Projects
As the ninth largest school district in Colorado, PSD serves over $30,000 students. Their mission is to support and inspire every child to think, learn, care, be  prepared to be successful in this rapidly changing word.

The official start of the PSD legacy began in 1866 when a woman started teaching her son and another child in a log cabin located on a military post in Fort Collins.

CPS installed one operable partition in 2021.

Product:

Moderco Signature 842 Series Operable Partition

  • Configuration: Paired
  • Panels: 6
  • STC Rating: 49
  • Track Finish: Clear Anodized
  • Panel Frame Finish: Clear Anodized
  • Closure: Telescopic
  • Top Seals: Fixed
  • Bottom Seals: Automatic
  • Panel Skin: Standard Vinyl